Preparation:
Ensure the surface is clean, dry and free from contamination. Suitable mechanical treatment is the preferred treatment prior to application, as this ensures a mechanical key for the coating.
Application:
1. Gently mix Part A for 2 minutes.
2. Pour 100% contents of Part B in to Part A and mix with a drill and paddle until homogeneous.
3. Begin applying product to the floor using a brush or roller (for clear and tidy lines we recommend using tape or stencils during application to ensure that no excess is laid).
4. One coat should be sufficient, apply a second coat if desired.
Due to the engineered viscosity profile, the applied paint will be thin and easy to work with once applied, then rapidly thickens to create a permanent, durable line.